Industrielle Klimaanlagenunterstützung über dem Parkplatzbereich
Introduction: In Ludwigsburg, we built a support structure for an air conditioning system to be installed above a parking lot. This industrial construction project combines efficient steel design with a space-saving approach.
Challenges: Because the parking area had to remain in use, the beams had to be positioned so as not to block any parking spaces. At the same time, the structure required enough load capacity to safely hold the heavy HVAC unit.
Solution: We devised a steel framework using slim yet high-capacity profiles that rest on precise concrete footings. Through accurate prefabrication and short installation times, we minimized disruptions to the parking facility.
Result: The air conditioning system now operates securely above the parking lot without affecting traffic flow. The client benefits from an intelligent use of space, with steel construction and industrial building solutions seamlessly integrated.
Facts (Project 6):
Tonnage | Location | Project Type | Date |
11 tons | Ludwigsburg | Industrial Construction | April 2024 |